Production Verifcation: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
Line 1: | Line 1: | ||
Production Verification, or PV phase, of hardware | Production Verification, or PV phase, of hardware or mechanical components. The first run of samples to use the final bill-of-materials before mass manufacturing. Used to identify any last-minute errors or corrections. | ||
==Hardware== | ==Hardware== | ||
===Zephyr_A=== | ===Zephyr_A=== |
Revision as of 17:42, 9 April 2024
Production Verification, or PV phase, of hardware or mechanical components. The first run of samples to use the final bill-of-materials before mass manufacturing. Used to identify any last-minute errors or corrections.