Production Verification, or PV phase, of hardware or mechanical components. The first run of samples to use the final bill-of-materials before mass manufacturing. Used to identify any last-minute errors or corrections.  
During the Production Validation Testing (PVT) milestone phases of hardware development. Release candidates of Production Verification (PV) builds were manufactured to test various bill-of-materials and config groups to validate for a final PVT system for production. The PV builds are used during PVT for final validation of hardware, and or mechanical components.  
==Hardware==
==Hardware==
===Zephyr_A===
===Zephyr_A===

Latest revision as of 12:01, 27 March 2025

During the Production Validation Testing (PVT) milestone phases of hardware development. Release candidates of Production Verification (PV) builds were manufactured to test various bill-of-materials and config groups to validate for a final PVT system for production. The PV builds are used during PVT for final validation of hardware, and or mechanical components.