Production Verifcation: Difference between revisions

From XenonLibrary
Jump to navigation Jump to search
mNo edit summary
mNo edit summary
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
Production Verification, or PV phase, of hardware, or mechanical components. Launch Ready.
During the Production Validation Testing (PVT) milestone phases of hardware development. Release candidates of Production Verification (PV) builds were manufactured to test various bill-of-materials and config groups to validate for a final PVT system for production. The PV builds are used during PVT for final validation of hardware, and or mechanical components.  
==Hardware==
==Hardware==
===Zephyr_A===
===Zephyr_A===
Line 37: Line 37:
|state      = uncollapsed
|state      = uncollapsed


   |list1    =  
   |list1    = FACERT-01A


}}
}}
==Mechancial==
==Mechancial==

Latest revision as of 12:01, 27 March 2025

During the Production Validation Testing (PVT) milestone phases of hardware development. Release candidates of Production Verification (PV) builds were manufactured to test various bill-of-materials and config groups to validate for a final PVT system for production. The PV builds are used during PVT for final validation of hardware, and or mechanical components.

Hardware

Zephyr_A

Zephyr_B

Zephyr_C

Falcon

Mechancial