Production Verifcation: Difference between revisions

From XenonLibrary
Jump to navigation Jump to search
mNo edit summary
mNo edit summary
Line 1: Line 1:
Production Verification, or PV phase, of hardware or mechanical components. The first run of samples to use the final bill-of-materials before mass manufacturing.
During the Production Validation Testing (PVT) phase of development. Release candidates of Production Verification (PV) builds were manufactured to test various bill-of-materials to validate the best candidate for production. The PV builds are used during PVT for final validation of hardware, and or mechanical components.  
==Hardware==
==Hardware==
===Zephyr_A===
===Zephyr_A===

Revision as of 05:32, 27 March 2025

During the Production Validation Testing (PVT) phase of development. Release candidates of Production Verification (PV) builds were manufactured to test various bill-of-materials to validate the best candidate for production. The PV builds are used during PVT for final validation of hardware, and or mechanical components.

Hardware

Zephyr_A

Zephyr_B

Zephyr_C

Falcon

Mechancial